6.3 «Main menu» screen and operation
6.3.1 Turning on the power
Before turning on the power:
1) Make sure that the connection is properly installed according to the Installation Manual.
2) Make sure that the product has been installed completely.
6.3.2 When the power is supplied, the screen below will appear.
Normal start up (indicating the percentage of process completion)
Please Wait
10%
6.3.3 Main display
After the successful startup, the «Main display» will appear.
The product is not in operation.
Lossnay
AM12:00 Sun
6.3.4 Main menu
Press the
button, this screen appear.
Main
Main menu
User options
Commissioning
Maintenance
Main display:
Cursor
F1
F2

6.4 Commissioning menu

- You can use Commissioning menu.
Commissioning menu
Initial setting
Airflow
Auto bypass
External input
Service
Main menu:
Cursor
Page
F1
F2
F3
- Administrator password is required. See 6.4.1 Administrator password.
Note
- Only the first time, the «Language selection» screen will be appeared.
- The product will not start-up without language selection.
- See 6.4.2.6 Language selection.
The product is in operation.
Lossnay
Boost
Fan
F3
F4
1/2
Commissioning menu
Restriction
Error information
Error history
Run time
Maintenance interval
Main menu:
Cursor
F4
F1
F2
AM12:00 Sun
Auto
Mode
Press the
button to move the cursor.
,
Press the
button to go to the next screen.
Press the
2/2
cursor.
Press the
Page
F3
F4
Eng-29
button to move the
,
,
,
button to go to the next screen.

Advertisement

Table of Contents
loading

Table of Contents