Miele FNS 28463 ED/CS Operating And Installation Instructions page 82

Table of Contents

Advertisement

Installation
The holes for securing the
connecting bracket  have to be
pre-drilled.
 Push the connecting bracket  with
cut-outs  over the holders for the
wall spacers.
 Use a pen to mark the position of the
drill holes.
 Then take the connecting bracket 
off again.
Drill through the panel only. Drilling
depth approx. 1 mm.
 Drill the screw holes with a 3 mm drill
bit and then file any rough edges
smooth.
82
 Place the connecting bracket  so
that the horizontal long slot is on the
left hand side and secure it as
follows:
1. Secure it loosely with the screw .
2. Adjust the connecting bracket  until
its centre piece abuts against the
side of the second appliance.
3. Secure the connecting bracket 
using the screw .
4. Now tighten the loose screw and as
you do so push the right hand
appliance up against the left hand
appliance.

Advertisement

Table of Contents
loading

Table of Contents