HOSES AND LEADS
Order
Job name/Part name
Removing the hoses and leads
Radiator inlet hose
Water pump assembly
1
Spark plug lead
2
Crankcase breather hose
3
Thermo switch lead
4
Starter motor lead
5
AC magneto lead coupler
6
Speed sensor lead coupler
7
Neutral switch lead coupler
8
Reverse switch lead
9
Engine ground lead
ENGINE REMOVAL
Q'ty
Remove the parts in the order below.
Refer to "THERMOSTAT" in CHAPTER 5.
Refer to "WATER PUMP" in CHAPTER 5.
1
1
1
1
2
1
1
1
Green/White
1
For installation, reverse the removal
procedure.
4 - 4
ENG
Remarks