Adjusting The Timing Chain - Yamaha 5KM2-AE1 Service Manual

Table of Contents

Advertisement

ADJUSTING THE VALVE CLEARANCE/ADJUSTING THE TIMING CHAIN/
ADJUSTING THE IDLING SPEED
11.Install:
Engine side cover
G
Fuel tank
G
Front fender
G
Front carrier
G
Seat
G
Refer to "SEAT, CARRIERS, FENDERS
AND FUEL TANK".

ADJUSTING THE TIMING CHAIN

Adjustment free.
ADJUSTING THE IDLING SPEED
1.Start the engine and let it warm up for sev-
eral minutes.
2.Remove:
Seat
G
Fuel tank side panels
G
Refer to "SEAT, CARRIERS, FENDERS
AND FUEL TANK".
3.Attach:
Tachometer
G
(to the spark plug lead)
Inductive tachometer:
Engine tachometer:
4.Check:
Engine idling speed
G
Out of specification → Adjust.
Engine idling speed:
3 - 16
CHK
ADJ
P/N. YU-8036-A
P/N. 90890-03113
1,450 ~ 1,550 r/min

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yfm660f(p) 2002

Table of Contents