Ransburg Vector AA90 Cascade Service Manual page 44

Table of Contents

Advertisement

Rebuild Barrel
1. Install tip and seals into barrel.
Figure 48a: Rebuilding Barrel
2. Install a generous amount of LSCH0009-00
into needle shaft cavity. Install needle shaft as-
sembly into barrel
Figure 48b: Rebuilding Barrel
3. Tighten packing nut until resistance on the shaft
may be felt when the shaft is pushed in and out.
AH-07-01.10
Vector AA90 Applicators - Maintenance
Figure 48c: Rebuilding Barrel
Install Barrel on Handle
1. Adjust spring retainer and locking nut to dimen-
sion shown. Tighten against each other.
Figure 49a: Install Barrel on Handle
2. Push barrel straight into handle.
3. Using 19749 wrench, tighten barrel nut
onto handle
4. Tighten fluid tube nut into place.
5. Install trigger and trigger screws.
40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector aa90 classic7958079581

Table of Contents