Preparing The Shut-Off Device/Shutter - Maico ER 60 G Mounting And Operating Instructions

Hide thumbs Also See for ER 60 G:
Table of Contents

Advertisement

11.5 Preparing the shut-off
device/shutter
Before mounting the housing, always
● ER-UP/G: check the position of the plastic
shutter. Ensure that the shutter is fully
functional.
● ER-UPD, ER-UPB: check the metal
shut-off device. Ensure that trigger
equipment is fully functional.
11.5.1 Plastic shutter without fire
protection ‒ ER-UP/G housing
6
ER-UP/G housing
1 Plastic backflow preventer
O: Installation position for upwards air
outlet direction
R: Installation position for right air outlet
direction
L: Installation position for left air outlet
direction
2 Plastic exhaust socket
11. Installation preparations
If installing on the wall with air outlet
direction (exhaust socket) to the left
or right, note the following.
Install shutter [1] turned 90° ( Fig. 6,
item [L] or [R]) so it closes fully
sealed in the installation position.
NOTICE
If the installation position is wrong, the
plastic shutter will not close sealed.
Odours may then escape from the
ventilation channel.
 Insert shutter [1] in exhaust socket [2]
of ER-UP/G housing as appropriate for
installation position, i.e. upwards/to
right/to left. Ensure that the shutter
closes fully sealed.
Preparing the plastic shutter for wall
installation
Upwards air outlet direction "O"
Do not carry out any modifications. The
shutter is fitted correctly ex-factory.
Air outlet direction to the right "R"
1. Remove plastic backflow preventer.
Simply pull this down and out of the
exhaust socket.
2. Turn backflow preventer  item [R].
3. Insert backflow preventer in exhaust
socket until stop is reached.
Air outlet direction to the left "L"
1. Remove plastic backflow preventer.
Simply pull this down and out of the
exhaust socket.
2. Turn backflow preventer  item [L].
3. Insert backflow preventer in exhaust
socket until stop is reached.
Preparing the plastic shutter for ceiling
installation
As a rule use the standard installation
position with upwards air outlet direction "O"
for ceiling installation. The shutter is fitted
correctly ex-factory.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Er-up/gEr-updEr-upbEr 60Er 100Centro-m ... Show all

Table of Contents