www.ti.com
5
Schematic
Figure 5
is the schematic for this EVM.
J1
Vin Up to 18 V
DNP
IN
DNP
J4
IN_S
TP5
TP6
J7
GND
GND
GND
SBVU050 – December 2018
Submit Documentation Feedback
U1
TP1
6
IN
IN_S
C1
C2
TP3
2.2uF
2.2uF
4
EN
EN
GND
R2
J6
100k
GND
TPS7A2601DRVR
TP7
TP8
GND
GND
GND
Figure 5. TPS7A26EVM-021 Schematic
Copyright © 2018, Texas Instruments Incorporated
1
OUT
C3
J3
2.2uF
2
FB/NC
R1
GND
3
TP4
PG
10.0k
5
GND
7
PG_S
PAD
DNP
GND
J9
OUTPUT VOLTAGE
R4
R5
R6
1.10M
301k
165k
GND
TP2
J2
Vout Selected by J9
Iout Up to 500 mA
OUT_S
DNP
C4
OUT
DNP
2.2uF
J5
GND
OUT_S
R3
C5
0.01uF
499k
J8
GND
GND
R7
57.6k
TPS7A26EVM-021 Evaluation Module
Schematic
7
Need help?
Do you have a question about the TPS7A26EVM-021 and is the answer not in the manual?