Summary of Contents for DREAMS SEOUL TV BED OTTOMAN UPGRADE
Page 1
SEOUL TV BED OTTOMAN UPGRADE FOR OTTOMAN BED, USE THIS AI, IGNORE THE AI IN PACK 3 a i l PLEASE READ yourself with the various stages of construction. Carefully open the cartons supplied and check the contents against the parts and fittings check lists.
Parts Checklist Ref. Description Ref. Description Headboard Media Tray Back Panel Cable Guard Back Panel Footboard Cable Guard Side Panels Side Rail - With Media Tray Mains Power Lead - 3 mt Side Rail - Without Media Tray Metal Slat Frame Support Bars Aerial Lead - 4 mt Pack Inside accessory...
Fittings Checklist HARDWARE NEEDED FOR ASSEMBLING AND FITTING CABLE GUARD PACKED IN OTTOMAN PACK 5 - HARDWARE PACK (D) Description Ref. Description Bolts (M8x30mm) for fitting Screws (5x50mm) for Cable Guard to Footboard (2) assembling Cable Guard Flat Washers (for M8 bolts) Plastic Barrel Nuts Additional Tools Required Care &...
Page 4
Prepare Head & Foot Ends & Choose Ottoman Opening Side - Use Pack 'A&D' CHOOSE WHICH SIDE YOU WANT TO LIFT UP - FROM LEFT Stage F (a) F (b) CHECK THIS DIAGRAM AND IF ACCESS IS NEEDED FROM LEFT SIDE OF BED, FIT BOTH LIFT MECHANISMS TO RIGHT SIDE OF THE BED.
Page 5
Prepare Head & Foot Ends & Choose Ottoman Opening Side - Use Pack 'A&D' CHOOSE WHICH SIDE YOU WANT TO LIFT UP - FROM RIGHT Stage F (a) F (b) CHECK THIS DIAGRAM AND IF ACCESS IS NEEDED FROM RIGHT SIDE OF BED, FIT BOTH LIFT MECHANISMS TO LEFT SIDE OF THE BED.
Page 6
Fitting Media Tray Side Rail left or right side - Use Pack 'A' Stage & Slide in first Base Board with Plastic Glides underneath Stage Page 6 of 21...
Page 7
Assemble Cable Guard - Use Pack 'D' Stage Assemble Media Tray - Use Pack 'B' Stage Page 7 of 21...
Fitting Media Tray - Use Pack 'B' Stage Electrical & Cable Connections Stage Connect Main Power Lead (15) to your wall socket - for safety there must be an earthed power supply. Page 8 of 21...
Page 9
Electrical & Cable Connections Stage Press the “UP” button to raise the TV lift. Note: For illustration purposes Stage only, TV connections may vary. TIP: BEFORE FITTING THE TV, PUSH CABLES THROUGH EACH DUCT FROM THE TOP. TV Power Lead CHOOSE THE BEST SIDE TO supplied with your TV USE DEPENDING ON WHERE...
Page 10
TV Installation - Normal Vesa Fixing IF SCREWS ARE SUPPLIED WITH TV, PLEASE USE THOSE IN PREFERENCE Stage Counter-Sunk Counter-Sunk Screws Screw-Washer a x2 sets (M8x25mm) - Screws (M4x12mm) (M6x12mm) Use 5mm Allen Key (D) b x2 Allen Key (4mm) Allen Key (2.5mm) Loosen Tighten...
Page 11
TV Installation - 100x100 Vesa Fixing Stage REMOVE CROSS-BRACKET 100mm AND FIX DIRECTLY TO BACK OF TV IF SCREWS ARE SUPPLIED WITH TV, PLEASE USE THOSE IN PREFERENCE Stage Screw-Washer Counter-Sunk Counter-Sunk Screws a x2 sets (M8x25mm) (M6x12mm) Screws (M4x12mm) Use 5mm Allen Key (D) b x2...
Page 12
TV Installation Kit - 100x100 Vesa Fixing Stage Loosen Tighten Page 12 of 21...
Page 13
Electrical & Cable Connections TV Power Lead Note: For illustration purposes Stage supplied with your TV only, TV connections may vary. Keep wires tight - peel off cover from cable clips & adhere to back of TV. PLUG IN - KEEP ALL CABLES TIGHT - USE CLIPS &...
Page 14
Electrical & Cable Connections Stage TV Power Lead supplied with your TV Press the “DOWN” button to lower the TV lift. Page 14 of 21...
Page 15
Stage Fitting Plain Side Rail to opposite side - Use Pack 'A' Stage & 100% Page 15 of 21...
Page 16
Assembling Cable Guard - Use Pack 'D' Stage Fitting Cable Guard - Use Pack 'D' Stage Page 16 of 21...
Page 17
Assembling Slat Frame - Use Pack ‘D’ Stage Using four sets of bolts (K) ,spring washer (B) & flat washers (C) fit two pieces of the m etal plate (L) into threaded inserts on top of the frame. Using Allen key (D), tighten all four bolts 100%. Stage Slat Frame Support Bar &...
Page 18
Assembling Slat Frame - Use Pack ‘D’ Stage Bolt into centre of long holes Stage Carefully lay frame down. Make sure there is an even gap each side of about 8mm, as in the sketch. Hold frame then tighten all six bolt sets 100% using spanner (J) &...
Page 19
Fitting Gas Lift Pistons - Use Pack ‘D’ Stage During this next step, the assistant should hold up the slat frame. On side rails (3&4) slide gas-lift piston stems (X) onto the axles (Y) then fit the flange lock-nuts (H). SMALL GAP Tighten nuts with spanner (J) - but DO NOT over-tighten.
Page 20
Safety Notice Stage Note: Be very careful what you store under the bed - the top of an item, like a suitcase or a box, must not touch the slats or they shall be damaged. Maximum storage height is 260mm. Fitting Mattress Stoppers Stage Page 20 of 21...
Page 21
TV BED SAFETY INFORMATION GENERAL INFORMATION It is very important not to place any vessel containing liquids, e.g. drinks or vase of flowers, on top of the TV footboard which may accidentally spill and enter the TV compartment as this could cause damage to the TV and/or the TV lifting equipment.
Need help?
Do you have a question about the SEOUL TV BED OTTOMAN UPGRADE and is the answer not in the manual?
Questions and answers