Download Print this page
DREAMS FRANCIS OTTOMAN Assembly

DREAMS FRANCIS OTTOMAN Assembly

Electric lift up bed
Hide thumbs Also See for FRANCIS OTTOMAN:

Advertisement

Quick Links

IMPORTANT: BEFORE STARTING TO ASSEMBLE THE BED - PLEASE READ THESE INSTRUCTIONS CAREFULLY.
A full instructional video of the assembly of this bed is available via YouTube using
Ide ntification
the following address:
Parts Identification
1
3
Parts Checklist
Ref.
Description
1
Headboard
Footboard
2
3
Side Rail - Left
4
Side Rail - Right
Mattress Base Board - Headend
5
Mattress Base Board - Footend
6
7a&7b
Storage Base Boards
8
Storage Base Board Support Rails
(Wood) Mattress Base Support Rails
9
190422
ELECTRIC LIFT UP BED
7a
5
4
8
2
Qty
1
1
1
1
1
1
2
5
2
Page 1 of 12
FRANCIS OTTOMAN
PLEASE READ this sheet prior to assembly to familiarise
yourself with the various stages of construction. Carefully
open the pack supplied and check the contents against the
parts and fittings check list.
Do not destroy any of the packaging until you are certain
that you have all the necessary parts for the assembly.
Please ensure that the packaging is disposed of in a safe
environmentally friendly way.
CAUTION: There are small components used in the
construction of this unit. These loose items should be kept
away from young children during assembly, to avoid the
danger of choking.
https://youtu.be/k_DqThx-bFs
7b
6
16
8
Only for single size, base board support
rail is without central uprights
Ref.
Description
10
Angle Brackets
Remote Control (is stored in rear of headboard)
11
12
Feet - Left
13
Feet - Right
14
Motor Guard - Side Panel
15
Motor Guard - End Panel
16
Mains Power Lead - 3 metre
17
Operation Guide for t he Motor System
*In single size bed, base board support rails (8) are
without central upright.
9
13
10
R
12
14
L
15
11
User Manual
MOTORISED OTTOMAN
LIFT UP STORAGE BED
17
Qty
2
1
2
2
2
2
1
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the FRANCIS OTTOMAN and is the answer not in the manual?

Questions and answers

Rita Nugent
April 27, 2025

What is the exact dimensions ?

1 comments:
Mr. Anderson
May 14, 2025

The exact dimensions of the Dreams Francesca Ottoman King Size bed are:

- Head End: 126 cm
- Length: 220 cm
- Width: 153 cm
- Foot End: 37 cm
- Floor to top of side rail: 37 cm

This answer is automatically generated

Summary of Contents for DREAMS FRANCIS OTTOMAN

  • Page 1 FRANCIS OTTOMAN ELECTRIC LIFT UP BED PLEASE READ this sheet prior to assembly to familiarise yourself with the various stages of construction. Carefully open the pack supplied and check the contents against the parts and fittings check list. Do not destroy any of the packaging until you are certain that you have all the necessary parts for the assembly.
  • Page 2 Fittings Checklist HARDWARE NEEDED FOR BED ASSEMBLY (PACK A) Code Description Code Description Bolts (M8x30mm) for Allen Key (for M8 bolt) fitting side rails (3&4) to headboard & footboar d (1&2) 17mm Spanner for M10 Motor Nut Spring Washers (for M8 bolts) Bolts (M8x60mm) for fitting feet (12&13) and fitting mattress base support rails (9) to...
  • Page 3 Bed Assembly - Use Pack 'A' Stage & Stage 10mm Page 3 of 12...
  • Page 4 Remove the Remote Control from behind the Storage Flap Stage RETRIEVE REMOTE CONTROL & PUT IN THE POCKET FOR SAFE KEEPING. Bed Assembly - Use Pack 'A' Stage & & Loosely fit all the bolts in place but do not tighten yet. Page 4 of 12...
  • Page 5 Bed Assembly - Use Pack 'A' Stage & Storage Base Board Assembly For Single Size Stage & 100% After fitting the wooden Base Board Support Rails, make certain the bed is squared up as shown in the diagram then tighten all bed assembly bolts 100%. Page 5 of 12...
  • Page 6: Mains Power Connection

    Mains Power Connection Stage Connect Main Power Lead (16) to your wall socket - for safety, this must be an earthed supply ON/OFF SWIT H Lift Support Arms with Remote Control UP Button Note: Please do not pull up the support arms! Stage These must be driven up by the motors.
  • Page 7 Fit First Storage Base Board (7a) For Single Size Stage Assemble Motor Guard Assembly - Use Pack 'C' Stage Page 7 of 12...
  • Page 8 Fit Motor Guard Assembly - Use Pack 'C' Stage D A B C PLEASE DO NOT STORE ANYTHING INSIDE THIS GUARD BOX OR THE MOTOR MAY GET DAMAGED.! PLEASE DO NOT STORE ANYTHING INSIDE THIS GUARD BOX OR THE MOTOR MAY GET DAMAGED.! Page 8 of 12...
  • Page 9 Fit Headend Mattress Base Board (5) - Use Pack 'B' Stage SLIDE HEADEND MATTRESS BASE BOARD (5) CAREFULLY SCREW BOLT SETS INTO MATTRESS BASE UP AGAINST THE LIFTING ARM STOP PLATES - BOARDS AS SHOWN - DO NOT TIGHTEN 100% YET. MAKE CERTAIN THE ENDS ARE IN THE CORRECT PLACE WITH THE BASE LEVEL AND SITTING FIRMLY ON THE SUPPORTS ARMS...
  • Page 10 Fit Footend Mattress Base Board (6) - Use Pack 'B' Stage SLIDE FOOTEND MATTRESS BASE BOARD (6) INTO POSITION LOOSLEY CONNECT THE PLATES SCREWING ALL 8 SETS OF BOLTS INTO PLACE 100% WHEN ALL BOLTS ARE IN PLACE, TIGHTEN ALL x16 BOLT SETS 100% Page 10 of 12...
  • Page 11 Fit Second Storage Base Board (7b) Stage Lower Mattress Base with Remote Control Down Button Stage PRESS Page 11 of 12...
  • Page 12: Emergency Lowering

    The batteries should last about two years with normal use. When you do need to Battery Change Guide change them, follow these instructions carefully. Please take care how you dispose of the old batteries - never put them on an open fire or throw them in the dustbin. REMOVE SCREW Turn Key Clockwise...