3.5.5 Field wiring

Follow the safety codes below.
(1) All wiring shall comply with applicable codes and engineering requirements.
(2) All field wiring shall be performed by qualified electricians.
(3) Never perform wiring before the power supply is cut off.
(4) Any damage caused by the improper external wiring shall be at the installer's expense.
Only copper conductors are allowed.
Follow the procedures below to wire the power lines to the electric box.
(1) The power cord must be routed inside the conduit.
(2) The power cord must enter the electric box through a rubber or plastic ring to avoid any damaged
caused by the sharp edge of the metal sheet.
(3) The power cord close to the electric box must be attached securely to prevent the terminal block of
the electric box affected by the outside force. The power cord shall be installed with a suitable cord
anchorage against cord loosing. See the wiring diagrams below for external wiring.