Installation; Installation Precautions; Testing Safety Functions - ABB Tina 3A Product Manual

Adapter unit
Table of Contents

Advertisement

4

Installation

The Tina unit shall be attached to the M20 entry before the safety loops are connected to
the device.
See max. tightening torques in chapter "Technical data".
4.1

Installation precautions

Warning! To maintain highest safety level and reduce risk of electrical interference the
Warning! The safety loop cables (safety loop A and B) shall be as short as possible
Warning! All safety functions shall be tested before starting up the system.
4.2

Testing safety functions

After each step the status of the input can be read on the monitoring device.
Steps for testing
1. Interrupt the DYNlink safety
circuit before the unit to be
tested
2. Close the DYNlink safety
circuit
3. Interrupt safety loop A
and/or B
2TLC172125M0201 Rev.F
unit shall be installed within the same physical encapsulation as the safety
device.
(max. 300 mm), as longer cables increase the risk for electrical interference.
LED indication
Green/red flashing
Green
Red
DYNlink signal output
Shall go low
Shall generate a DYNlink
signal
Shall go low