Section 10
Testing functionality by secondary injection
10.4.6.13
Test of FollowStart&Mode behaviour
1.
Set StartMode = FollowStart&Mode.
2.
Set FunctionMode = Current.
3.
Set RetripMode = UseFunctionMode.
4.
Use default value for tStartTimeout = 1.0 s.
5.
Use default value for time delay backup trip t2 = 0.150 s.
6.
Use default value for time delay re-trip t1 = 0.000 s.
7.
Leave the inputs for CB close inactivated. These signals should not influence.
8.
Apply START signal, and after 0.200 s apply the current above the set IPPU value.
9.
Check that STALARM does not come and that re-trip TRRET is instantly set at 0.200s while the
backup trip TRBU set only when t2 expires at 0.200 + 0.150s.
10.4.6.14
Test of FollowStart behaviour
1.
Set StartMode = FollowStart.
2.
Set FunctionMode = Current.
3.
Set RetripMode = UseFunctionMode.
4.
Use default value for tStartTimeout = 1.0 s.
5.
Use for example the default value for time delay backup trip t2 = 0.150 s.
6.
Use for example the default value for time delay retrip t1 = 0.000 s.
7.
Leave the inputs for CB close inactivated. These signals should not influence.
8.
Apply START signal, and after 0.200 s apply the current above the set IPPU value.
9.
Check that STALARM does not come and that both re-trip TRRET and backup trip TRBU comes
instantly at 0.200 s (that is, as soon as current is given to the function).
10.4.6.15
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
10.4.7
Breaker failure protection, single phase version CCSRBRF (50BF)
Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
The parameters for the Breaker failure protection, single phase version CCSRBRF (50BF) are set via the
local HMI or PCM600.
The breaker failure protection, single phase version function CCSRBRF (50BF) must be tested in
combination with some other function that provides a BFI_3P signal. An external BFI_3P signal can also
be used.
CCSRBRF (50BF) has to be set and configured before the testing can start. CCSRBRF is highly flexible
in that it permits a choice of functional and tripping modes (50BF). The various modes are checked at the
factory as part of the design verification. In certain cases only modes with a high probability of coming
into operation need to be checked, in order to verify the configuration and settings.
Testing requirements
88
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 372-UUS Rev. K
GUID-D68675FC-2533-4D6F-A26B-E1611FB7B32A v1
GUID-E3FFFAD0-C9E9-4EAF-8418-314E9D475EDA v1
"Requirements"
and section
Busbar protection REB670
Commissioning manual
M12104-72 v5
SEMOD128582-3 v5
"Preparing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reb670

Table of Contents