ABB Relion 670 Series Commissioning Manual page 12

Busbar protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Table of contents
10.8.1
Fuse failure supervision FUFSPVC.......................................................................................114
10.8.1.1
10.8.1.2
10.8.1.3
10.8.1.4
10.8.1.5
10.8.1.6
10.8.2
Fuse failure supervision ........................................................................................................117
10.8.2.1
10.8.3
Voltage based delta supervision DELVSPVC........................................................................ 118
10.8.3.1
10.8.3.2
10.8.4
Current based delta supervision DELISPVC(7I)....................................................................119
10.8.4.1
10.8.4.2
10.8.5
Delta supervision of real input DELSPVC............................................................................. 120
10.8.5.1
10.8.5.2
10.9
Control.....................................................................................................................................121
10.9.1
Synchrocheck, energizing check, and synchronizing SESRSYN (25).................................. 121
10.9.1.1
10.9.1.2
10.9.1.3
10.9.1.4
10.9.1.5
10.9.2
Autorecloser for 1/2/3-phase operation SMBRREC (79).......................................................128
10.9.2.1
10.9.2.2
10.9.2.3
10.9.2.4
10.9.2.5
10.9.3
Apparatus control APC..........................................................................................................133
10.9.4
Function revision history........................................................................................................134
10.9.5
Single command, 16 signals SINGLECMD........................................................................... 134
10.9.6
Interlocking............................................................................................................................ 134
10.10
Monitoring................................................................................................................................134
10.10.1
Gas medium supervision SSIMG.......................................................................................... 134
10.10.1.1
10.10.1.2
10.10.1.3
10.10.1.4
6
Checking that the binary inputs and outputs trip as expected ......................................... 114
Measuring the trip value for the negative sequence function .......................................... 114
Measuring the trip value for the zero-sequence function .................................................115
Measuring the trip value for the dead line detection function........................................... 116
Checking the operation of the dv/dt and di/dt based function ..........................................116
Completing the test...........................................................................................................117
Completing the test...........................................................................................................118
Verifying the signals and settings..................................................................................... 118
Completing the test...........................................................................................................119
Verifying the signals and settings..................................................................................... 119
Completing the test.......................................................................................................... 120
Verifying the signals and settings..................................................................................... 120
Completing the test.......................................................................................................... 120
Testing the synchronizing function................................................................................... 122
Testing the synchrocheck functionality............................................................................. 123
Testing the energizing check............................................................................................ 125
Testing the voltage selection............................................................................................ 126
Completing the test.......................................................................................................... 128
Preparation of the verification ..........................................................................................130
Switching the auto recloser to On and Off Enabled and Disabled .................................. 131
Verifying the auto recloser ...............................................................................................131
Checking the auto reclosing conditions............................................................................132
Completing the test.......................................................................................................... 133
Function revision history...................................................................................................135
Testing the gas medium supervision for pressure alarm and pressure lockout
conditions ........................................................................................................................ 135
Testing the gas medium supervision for temperature alarm and temperature lockout
conditions ........................................................................................................................ 135
Completing the test.......................................................................................................... 136
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 372-UUS Rev. K
Busbar protection REB670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reb670

Table of Contents