ABB Relion 670 Series Commissioning Manual page 171

Busbar protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 505 372-UUS Rev. K
7.
Pull out the faulty module.
8.
Check that the new module has a correct identity number.
9.
Check that the springs on the card rail are connected to the corresponding metallic area on the
circuit board when the new module is inserted.
10. Reassemble the IED.
If the IED has been calibrated with the system inputs, the calibration procedure must be performed again
to maintain the total system accuracy.
13.4
Repair support
If an IED needs to be repaired, the whole IED must be removed and sent to an Hitachi Power grids
Logistic Center. Please contact the local Hitachi Power grids representative to get more details.
13.5
Maintenance
The IED is self-supervised. No special maintenance is required.
Instructions from the power network company and other maintenance directives valid for maintenance of
the power system must be followed.
Busbar protection REB670
Commissioning manual
Remove the IED from the panel if necessary.
Remove the rear plate of the IED.
Remove the front plate.
Remove the screws of the transformer input module, both front and rear.
© 2017 - 2022 Hitachi Energy. All rights reserved
Section 13
Troubleshooting
M11768-3 v4
M11769-3 v2
165