Section 10
Testing functionality by secondary injection
4.
Note the voltage magnitude value and compare it with the set value.
5.
Slowly increase the frequency of the applied voltage, to a value above PUFrequency.
6.
Check that the PICKUP signal does not appear.
7.
Wait for a time corresponding to tDelay, make sure that the TRIP signal does not appear.
10.6.2.2
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
10.6.3
Rate-of-change frequency protection SAPFRC (81)
Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
10.6.3.1
Verifying the settings
PICKUP value and time delay to trip
1.
Check that the settings in the IED are appropriate, especially the PICKUP value and the definite
time delay. Set PickupFreqgrad, to a rather small negative value.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the frequency of the applied voltage, with an increasing rate-of-change that finally
exceeds the setting of PickupFreqgrad, and check that the PICKUP signal appears.
4.
Note the trip value and compare it with the set value.
5.
Increase the frequency to rated operating conditions, and zero rate-of-change.
6.
Check that the PICKUP signal resets.
7.
Instantaneously decrease the frequency of the applied voltage to a value about 20% lower than the
nominal value.
8.
Measure the time delay for the TRIP signal, and compare it with the set value.
Extended testing
1.
The test above can be repeated to check a positive setting of PickupFreqGrad.
2.
The tests above can be repeated to check the time to reset.
3.
The tests above can be repeated to test the RESTORE signal, when the frequency recovers from a
low value.
10.6.3.2
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
110
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 372-UUS Rev. K
"Requirements"
and section
Busbar protection REB670
Commissioning manual
M16290-52 v5
M16256-2 v6
"Preparing
M16256-8 v1
M16256-10 v5
M16256-29 v4
M16256-39 v4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reb670

Table of Contents