Bosch MUC8 Series Instruction Manual page 10

Hide thumbs Also See for MUC8 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
en
Before using for the fi rst time
14. Insert pan
Reinsert the pan in the appliance
interior. The pan handles must be sunk
into the indentations.
Caution!
Before inserting the pan, check that the
appliance interior is dry and clean.
15. Place lid insert
The pressure locking handle must be
opened (M). Place the lid insert on the
lid insert mount with the steam valve at
the bottom. At the same time, guide the
steam valve through the steam valve
opening. Tighten the fastening screw for
the lid insert clockwise on the lid insert
mount.
16. Close the lid
Press the lid down until it clicks into
place. Close the pressure locking
handle (N). For this purpose, rotate
the pressure locking handle as far as
possible in a clockwise direction.
17. Insert the valve plug
Place the valve plug in the steam
release chamber on the steam valve
and press down fi rmly.
Caution!
Make sure that the white steam release
lever is positioned below the valve plug.
10
MUC6_MUC8_EU2_8001036705.indb 10
18. Insert the steam outlet
Place the steam outlet on the lid from
above and press down fi rmly.
19. Insert the condensation water tank
Fold up the carrying handle. Hold the
tank by the sides at the top and insert at
the rear of the appliance.
20. Connect the supplied mains cable to the
appliance fi rst and then connect it to the
socket.
Caution!
Use only the supplied mains cable.
On the control panel, buttons B and G
and all LEDs briefl y light up once and a fi ve-
level audible signal sounds. Button B then
fl ashes. The appliance is in standby mode
and is ready for operation.
15.03.2016 14:45:25

Advertisement

Table of Contents
loading

Table of Contents