Graco 256282 Instructions Manual page 12

Table of Contents

Advertisement

Installation
Drum Mount Bracket (F
Mounting Bracket 15B750 is available for resting the
dispense valve on a drum.
F
. 15
IG
Oil Bar (F
. 16)
IG
An Oil Bar Kit 255370 is available for mounting up to two
meters.Oil bar kit 156719 allows for mounting three
meters.
F
. 16
IG
12
. 15)
IG
ti11823
ti12303a
Pressure Relief Procedure
This equipment will stay pressurized until the pressure
has been manually relieved. To reduce the risk of
serious injury from pressurized fluid, accidental spray
from the dispense valve or splashing fluid, follow this
Pressure Relief Procedure when ever you:
Are instructed to relieve pressure.
Check, clean or service any system equipment.
Install or clean fluid nozzles or filter.
1. Turn off power supply to the pump or close
upstream ball valve.
2. Open nozzle. Trigger the dispense valve into a
waste container to relieve pressure.
3. Open any bleed-type master air valves and fluid
drain valves in the system.
4. Leave the drain valve open until you are ready to
pressurize the system.
Grounding
FIRE HAZARD: Conductive metal surfaces on the
meter must not make contact with any positively
charged metal surface, including (but not limited to),
the starter solenoid terminal, alternator terminal or
battery terminal. Such contact could cause electrical
arcing and a fire.
The equipment must be grounded. Grounding reduces
the risk of static and electric shock by providing an
escape wire for the electrical current due to static build
up or in the event of a short circuit.
Pump: Follow manufacturer's recommendations.
Air and fluid hoses: Only use electrically conductive
hoses. Check electrical resistance of hoses. If total
resistance to ground exceeds 29 megohms, replace
hose immediately.
313046A

Advertisement

Table of Contents
loading

Table of Contents