COMMISSIONING
POWER
SELECTOR
KNOB

COMMISSIONING PROCEDURE

The first operation of the shower is intended
to flush out any remaining unit debris and
to make sure the heater unit contains water
before the elements are switched on.
This operation MUST be carried out WITH
the flexible hose screwed to the outlet but
WITHOUT THE SHOWERHEAD ATTACHED.
Make sure the outlet of the flexible hose is
directed to waste.
TEMPERATURE
CONTROL
1. Before turning on the electric supply to the
KNOB
2. Turn on the electric supply to the shower at
3. Press the Start/Stop button and wait until
4. Once flushing out has been completed, stop
19
WARNING
Before normal operation of the shower, it
is essential the following commissioning
procedure is completed correctly.
shower, make sure that the power selector is
at the 'COLD' position and the temperature
control is turned to fully anti-clockwise to
'MAXIMUM' flow (fig.17).
the isolating switch.
water starts to flow from the flexible hose. At
least 30 seconds
the water flow by pressing the Start/Stop
button.