Installation; Unpacking Information; Voltage - Pacific Hoists PEH050NH Operation Manual

Table of Contents

Advertisement

4. INSTALLATION

4.1 Unpacking Information

After removing the hoist from its packing box, carefully inspect the external condition of
the electrical cables, contactor, gearbox and motor casing for damage.
Check and ensure that these items are present.
Each hoist is supplied as standard with the following accessories.

4.2 Voltage

If power supply deviates from standard by more than ± 10% abnormal
operation or damage to the motor may result. It is imperative to ensure
correct voltage supply before commencing operation.
4.3 Installation
Connection to power supply before installation procedures having been
completed is strictly prohibited.
1. Chain bucket
2. Power cable
3. Push button control switch
1 set
0.5 meter
1 piece
Table. 4-1