6.1.3 Three-monthly check-up
Biddle recommends to carry out the following checks every
three months:
•
Test and inspect the corridor frame and the suspension of
the air curtain units. They should show no sign of play or
rust.
•
Inspect the electrical connections. The cables should be
well connected and the cable sleeves should be intact.
•
Inspect the corridor. The insulation should show no leaks.
6.1.4 Yearly maintenance
Biddle recommends to have the following maintenance done
every year.
Danger:
Do not attempt to carry out maintenance, unless
you are technically qualified.
•
Clean the interior of the air curtain unit(s) and the fans.
Note:
The fan motors do not need to be lubricated.
•
Visually inspect the electronic parts and wires within the
electronics compartment of the air curtain unit(s).
See Section
6.2
on how to access the interior of the air cur-
tain unit.