3.3.2 Suspending

1. Lift the unit by its pallet, and place it approximately into its
final position, according to
2. Place the suspension frame 4 onto the thread rods, over
the horizontal bars of the corridor frame.
3. Fix the suspension frame, by applying a nut 5 on each
thread rod.
4. Take the lifting device with the pallet away. The unit should
now be hanging freely.

3.3.3 Adjusting vertically and securing

1. Adjust the vertical position of the unit with the nuts 5,
according to
Figure
3-5.
Caution:
The unit must be suspended level.
2. Secure the nuts by applying a counter nut 6 on each
thread.
(Figure
3-4)
Warning:
The nuts on the thread rods must be secured.
3. Saw off the superfluous parts 7 of the thread rods.
ure
3-4) Leave approximately 10 cm.
I
NSTALLATION
Figure
3-3. Use a lifting device.
(Fig-
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MAT and is the answer not in the manual?

Table of Contents