Monitoring Of Test Resources; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN KFC-TM Operating And Installation Instructions

Table of Contents

Advertisement

4.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the display
unit and, if applicable, the testing weight, must be checked regularly. The responsible
user must define a suitable interval as well as type and scope of this test. Information
is available on KERN's home page
of display units' test substances and the test weights required for this. In KERN's
accredited DKD calibration laboratory test weights and display units may be calibrated
(return to the national standard) fast and at moderate cost.

5 Basic Safety Precautions

5.1 Pay attention to the instructions in the Operation Manual

 Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN balances.

5.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

6 Transport and storage

6.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the appliance
itself when unpacking for possible visible damage.

6.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly
 Only use original packaging for returning.
 Prior to dispatch disconnect all cables and remove
 Reattach possibly supplied transport securing devices.
 Secure all parts such as the glass wind screen, the
TKFC-TM-A-BA_IA-e-2212
(www.kern-sohn.com
required return.
loose/mobile parts.
weighing platform, power unit etc. against shifting and
damage.
with regard to the monitoring
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tkfc-tm-a

Table of Contents