Step4
Remove the debris baffle and secure the battery to the wall with screws and gaskets.
Figure 11Battery Installation-Mounting on the Wall
Step 5
To assemble the second (and all other) battery, repeat steps 6 and 7, respectively.
Figure 12 Battery Installation Second Battery Installation
2.2.2 Inverter Installation
Step 6
Inverter Installation.
22
Need help?
Do you have a question about the RI-ENERGYFLOW-3P-MODULAR RI-ENERGYFLOW-HYBRID and is the answer not in the manual?