Index - HP FlexNetwork 5140 EI Series Installation Manual

Table of Contents

Advertisement

Index

A C E F G H I L M N P R S T V
A
Attaching the mounting brackets to the
C
Cleanliness,3
Combo
interface,55
Configuration terminal
Configuring basic IRF
Connecting the AC power cord for the fixed AC
power
supply,18
Connecting the DC power cord for the fixed DC
power
supply,19
Connecting the IRF physical
Connecting the micro USB console
Connecting the power
Connecting the power cord for a PSR150-A1 power
supply,20
Connecting the power cord for a PSR150-D1 power
supply,21
Connecting the serial console
Console
port,49
Corrosive gas
limit,3
E
EMI,4
Ethernet port
LEDs,57
Examining the installation
F
Fan tray
failure,35
Fixed power supply
failure,34
G
Garbled display on the configuration
Grounding the
switch,12
Grounding the switch with a grounding conductor
buried in the earth
ground,15
Grounding the switch with a grounding
H
HPE 5140 24G 4SFP+
HPE 5140 24G PoE+ 2SFP+ 2XGT
HPE 5140 24G PoE+ 4SFP+
HPE 5140 24G SFP w/8G Combo 4SFP+
HPE 5140 48G 4SFP+
HPE 5140 48G PoE+ 2SFP+ 2XGT
HPE 5140 48G PoE+ 4SFP+
switch,9
issues,35
settings,32
ports,33
cable,24
cord,18
cable,23
site,2
terminal,36
strip,14
EI,42
EI,47
EI,45
EI,44
EI,43
EI,47
EI,46
I
Identifying IRF physical ports on the member
switches,30
Identifying the master switch and planning IRF
member
IDs,29
Installation
accessories,5
Installation
tools,5
Installing a power
supply,17
Installing and removing power
Installing the switch in a 19-inch
IRF fabric setup
flowchart,28
L
Laser
safety,4
LEDs,55
M
Management Ethernet
Management Ethernet port
Mode LED
(MODE),57
Mounting
brackets,8
Mounting the switch on a
N
No display on the configuration
Non-PoE switch
models,37
P
Planning IRF fabric
Planning IRF fabric size and the installation
Planning IRF topology and
Planning the cabling
PoE switch
models,39
Ports,49
Power supply status
Powering on the
switch,26
R
Rack-mounting the
Removable power supply
Removing a power
RPS status
LED,56
S
Safety
recommendations,2
Setting terminal
parameters,26
Setting up the configuration
61
supplies,16
rack,8
port,50
LED,56
workbench,12
terminal,35
setup,29
connections,29
scheme,31
LED,56
switch,10
failure,34
supply,17
environment,23
site,29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpe 5140 24g 4sfp+ eiHpe 5140 48g 4sfp+ eiHpe 5140 24g poe+ 4sfp+ eiHpe 5140 48g poe+ 4sfp+ eiHpe 5140 24g sfp w/8g combo 4sfp+ eiHpe 5140 24g poe+ 2sfp+ 2xgt ei ... Show all

Table of Contents