OPERATION
15. Low Voltage Delay in seconds
(0 to 120)
The amount of time the controller will wait after the battery voltage falls below
the low voltage setpoint before it indicates a fault. Use this to set the value ac-
cording to system requirements if using the custom battery profile.
WARNING: DO NOT use it if you are unsure of how to properly set, or
consult a professional.
16. Equalization Time in minutes
(0 to 600)
The amount of time the controller will hold the battery voltage at the equalization
voltage setpoint before transitioning to float. Use this to set the value according to
system requirements if using the custom battery profile.
WARNING: DO NOT use it if you are unsure of how to properly set, or
consult a professional.
17. Absorption Time in minutes
(0 to 600)
The amount of time the controller will hold the battery voltage at the absorption
voltage setpoint before transitioning to float. Use this to set the value according to
system requirements if using the custom battery profile.
WARNING: DO NOT use it if you are unsure of how to properly set, or
consult a professional.
18. Equalization Interval in days
(0 to 225)
The frequency at which the controller will perform an equalization. Use this to set
the value according to system requirements if using the custom battery profile.
WARNING: DO NOT use it if you are unsure of how to properly set, or
consult a professional.
19. Temperature Compensation
(0 to 30)
The temperature compensation setpoint used during temperature compensated
charging. Use this to set the value according to system requirements if using the
custom battery profile.
WARNING: DO NOT use it if you are unsure of how to properly set, or
consult a professional.
20. Firmware Version
The firmware version currently programmed onto the controller.
gopowersolar.com | [page 19]
Need help?
Do you have a question about the Go Power! GP-SB-PWM-10 and is the answer not in the manual?