Inspections After Operations; Periodical Maintenance - Hyundai 12ESH Operation Manual

Electric stacker
Table of Contents

Advertisement

8.Inspections after operations
After operations, wipe out dirt on the truck, and conduct the following inspections:
Keep all the warning signs, nameplates, warning labels and other image-text signals complete and clear. Such signals
have certain guiding, reminding and warnings functions for operators.
Check whether there is any distortion, damage or breaking condition.
Add lubricating oil according to situations. Replace the faulted spare parts.
9. Periodical Maintenance
Full inspections on the truck can avoid failures and ensure its service life. The hour listed in the maintenance
procedures is based on the situation where the truck works for 8 hours per day and 200 hours per month. For
safe operations, the truck should be maintained according to the maintenance procedures.
qualified personnel
For the service work such as adjusting or replacing the spare parts, please contact our sales department.
9.1 Precautions for maintenance:
When replacing, adopt the original spare parts of our company. All of the
spare parts of the truck should be replaced by those which have equivalent
safety requirements as the original design when they need to be replaced.
Adopt the lubricating oil and hydraulic oil recommended by our company.
⑴ Sites for maintenance:
Attention
All the repair work should be performed by professionally trained and
Attention
Attention
Should be the designated sites, able to provide the service mechanisms
such as hoisting and safety protection devices.
The site should be flat ground.
The site should be well-ventilated.
The site should be equipped with firefighting devices.
16

Advertisement

Table of Contents
loading

Table of Contents