5 Installation

This section describes how to install and connect the unit. It includes the following topics:
·

Pre-Installation Checklist

·

Indoor Installation

·
Outdoor Installation
·
Powering the Camera
·
Connecting the Camera to the Network
·
Mounting the Camera
·
Adjusting and Framing-Up the Camera View
5.1
Pre-Installation Checklist
Before installing the unit, make sure that:
·
Instructions in the
·
All related equipment is powered off during the installation.
·
Use best security practices to design and maintain secured camera access, communications
infrastructure, tamper-proof outdoor boxes, etc.
·
All electrical work must be performed in accordance with local regulatory requirements.
Caution:
To avoid damage from overheating or unit failure, assure that there is sufficient temperature
regulation to support the unit's requirements (cooling/heating). Operating temperature should be
kept in the range -10° to 50°C (14° to 122°F), with no more than 90% non-condensing humidity.
Attention:
Afin d'éviter tout dommage dû à une surchauffe ou toute panne de l'unité, assurez-vous que la
régulation de température est suffisante pour répondre aux exigences de l'unité
(refroidissement/chauffage). La température de fonctionnement doit être maintenue dans la
plage (-10° à 50°C/14° à 122°F), sans condensation d'humidité supérieur à 90%.
5.2
Indoor Installation
Read the instructions provided in this chapter thoroughly before installing the camera. Following are
additional considerations for indoor installation:
·
There must be a fuse or circuit breaker at the starting point of the electrical wiring infrastructure.
·
For indoor installations, such as industrial applications, the camera must be protected from hostile
external elements (e.g. corrosive environment, metallic dust, extreme temperatures, soot, over
spray, etc.).
·
Do not place the camera on or near radiators and heat sources.
·
All electrical work must be performed in accordance with local regulatory requirements.
October 17, 2017
Document Scope and Purpose
CM-6212 H1-I User and Installation Guide
section are followed.
Installation
19

Advertisement

Table of Contents
loading

Table of Contents