RDZ WHR 61 Technical Installation Manual page 36

Air handling units, mechanical ventilation with heat recovery appliance
Table of Contents

Advertisement

Available languages

Available languages

3) ASSEMBLY CONCLUSION
After the connection, carefully arrange the terminal box and the cables in the proper
compartment and insert the ceramic heat exchanger (7) with related filters (8), placing it in the
middle of the recessed tube (6) as shown in the picture here below:
Fix the main unit (3), with its shutter (2) and the cosmetic frontal cover (1) already assembled on
it, on the internal wall-mounting part (4i) until complete assembly. Make sure to install the main
unit on the wall placing all the switches in the top left.
35

Advertisement

Table of Contents
loading

Table of Contents