Mounting The Indoor Unit; About Mounting The Indoor Unit; Precautions When Mounting The Indoor Unit; To Install The Indoor Unit - Daikin ETVZ16S18EA6V Installer's Reference Manual

Hide thumbs Also See for ETVZ16S18EA6V:
Table of Contents

Advertisement

7.4 Mounting the indoor unit

7.4.1 About mounting the indoor unit

7.4.2 Precautions when mounting the indoor unit

7.4.3 To install the indoor unit

EPRA14~18DAV3+W1 + ETVZ16S18+23EA6V+9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02
Typical workflow
Mounting the indoor unit typically consists of the following stages:
1
Installing the indoor unit.
INFORMATION
Also read the precautions and requirements in the following chapters:
"2 General safety
"7.1 Preparing the installation
1 Lift the indoor unit from the pallet and place it on the floor. Also see
handle the indoor
unit" [
2 Connect the drain hose to the drain. See
4
the
drain" [
 66].
3 Slide the indoor unit into position.
4 Adjust the height of the leveling feet to compensate for floor irregularities.
The maximum allowed deviation is 1°.
5
6
4
precautions" [
 10]
4
site" [
 49]
4
 25].
"7.4.4 To connect the drain hose to
7
Unit installation
|
"4.3.3 To
≤1°
Installer reference guide