Daikin ETVZ16S18EA6V Installer's Reference Manual page 113

Hide thumbs Also See for ETVZ16S18EA6V:
Table of Contents

Advertisement

EPRA14~18DAV3+W1 + ETVZ16S18+23EA6V+9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02
f Smart Grid pulse meter
1 Install the components of the Smart Grid relay kit as follows:
×2
×4
K1A, K2A Relays
X10M Terminal block
a Screws for X10M
b Screws for K1A and K2A
c Sticker to put on the high voltage wires
d Wires between the relays and X5M (AWG22 ORG)
e Wires between the relays and X10M (AWG18 RED)
B
A
B
2 Connect the low voltage wiring as follows:
A
B
A
B
3 Connect the high voltage wiring as follows:
d
a
K1A
b
c
X10M
b
b
K1A
K2A
1 2 3 4
a
X10M
5 6 9 10
3 4
9
Electrical installation
|
K2A
e
X5M
X5M.4
S4S
X5M.3
1314
X5M
Installer reference guide
113