Daikin ETVZ16S18EA6V Installer's Reference Manual page 72

Hide thumbs Also See for ETVZ16S18EA6V:
Table of Contents

Advertisement

8
|
Piping installation
Installer reference guide
72
A
2,4
2,1
1,8
1,5
1,2
1
0,9
0,6
0,3
70
20
A Pre-pressure (bar)
B Maximum water volume (l)
Water
Water + glycol
Example: Maximum water volume and expansion vessel pre-pressure
Installation
height
(a)
difference
≤7 m
No pre-pressure adjustment is
required.
>7 m
Do the following:
Increase the pre-pressure
according to the required
installation
difference. The pre-pressure
should increase by 0.1 bar
for each metre above 7 m.
Check if the water volume
does
maximum
volume.
(a)
This is the height difference (m) between the highest point of the water circuit and the
indoor unit. If the indoor unit is at the highest point of the installation, the installation
height is 0 m.
Minimum flow rate
Check that the minimum flow rate in the installation is guaranteed in all conditions
on each zone separately. This minimum flow rate is required during defrost/backup
heater operation. For this purpose, use the overpressure bypass valve delivered
with the unit.
Minimum required flow rate
25 l/min
120
220
140
200
175
Water volume
≤190 l
Do the following:
The expansion vessel of the
indoor unit is too small for the
installation. In this case, it is
recommended to install an
height
extra vessel outside the unit.
NOT
exceed
the
allowed
water
270
255
B
>190 l
Decrease the pre-pressure
according to the required
installation
difference. The pre-pressure
should decrease by 0.1 bar
for each metre below 7 m.
Check if the water volume
does
NOT
exceed
maximum
allowed
volume.
EPRA14~18DAV3+W1 + ETVZ16S18+23EA6V+9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02