9
|
Electrical installation
9.3.8 To connect the changeover to external heat source
Installer reference guide
106
A
B
A
B
a Installation of EKRP1HBAA is required.
b Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C] Bivalent
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
7
b
7
9
X2M
A4P
a
"7.2.5 To open the indoor
Y2
4
unit" [
55]):
EPRA14~18DAV3+W1 + ETVZ16S18+23EA6V+9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02
1
3
2