12.10
Removing the lower triple clamp
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
E00922-10
(All Six Days models)
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the front wheel.
–
Remove the headlight mask with the headlight. (
–
Remove the fork legs.
–
Remove front fender. (
–
Remove the handlebar cushion.
Main work
–
Remove screws
–
Open the cable holder in front of the left and right radiator and
detach the wiring harness.
E00923-10
–
Remove screw
–
Remove screw
handlebar and set it aside.
Info
Cover the components to protect them against damage.
Do not kink the cables and lines.
E00924-10
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
E00925-10
12 SERVICE WORK ON THE CHASSIS
4
. Remove protective ring
(
p. 111)
(
p. 68)
p. 78)
1
and hang the voltage regulator to the side.
2
.
3
. Take off the upper triple clamp with the
4
. Remove protective ring
5
.
p. 66)
p. 123)
5
.
71