The first step is to push the blower against the radiometer housing so that the mushroom pins slide
into the blower's mounting pockets (1. in Fig.2.6.2). In the second step, the blower is released to
slide downwards (2. in Fig.2.6.2), so that the mushroom pins get locked inside the pockets.
In order to dismount the blower, the inverse movement is required, e.g. when unpacking the
radiometer box (Fig.2.2.1), the blower has to be removed from the radiometer housing in order to
lift the radiometer onto the instrument stand. Each time the instrument is packed or unpacked, the
blower has to be mounted or dismounted in this way.
2.6.2 Heater Module
Heated air outlet
Fig.2.6.3: Dew blower heater module with mounting points.
Fig.2.6.4: Remove heater mounting screws from the blower.
23
2 Setup and Installation ► 2.6 Mounting of Externals (Blower, Heater, IRR, Weather Station)
Code:
RPG-MWR-STD-INST
Date:
Installation & Maintenance
Mounting points
Connection to radiometer
Blower input
Issue:
23.03.2015
Pages:
(standard radiometers)
01/04
74