Installation

3.7 On-Site Insulation Test

If on-site insulation testing is required, make sure:
1. The DC switch is in the "OFF" position.
2. Place one probe in any DC connectors shown in Figure 3-24 and the other on
the ground.
OFF
DC Switch
OFF
ON
DC connectors
Figure 3-24: Precautions for on-site insulation test