4.2 Reception of goods

On receiving the goods, ensure that the type and quantity correspond to the data present on the acknowledge-
ment of order.
Possible damage has to be immediately communicated in writing in the space provided to this purpose in the
waybill.
The carrier is obliged to accept the complaint and leave the Customer a copy of the waybill.
If the supply is "free destination" a copy of the waybill and of the complaint shall be sent to the Manufacturer
or to the forwarder.
If the damages are not claimed immediately on receipt of the goods, your request for compensation may not
be accepted.
N.B.: The data mentioned in the table below do not include the weight of any cumulative package (pallet or
other).

4.3 Lifting and unloading methods

Danger - Warning
Carry out the lifting and handling operations according to the information indicated on the valve and in
the Manufacturer's Operation Manual.
The person authorized for unloading operations has to make sure all the necessary measures are adopt-
ed to ensure his or her safety and the safety of other persons directly involved.
Use means and accessories (ropes, hooks, shackles etc.) suitable for the load to be lifted.
Pay attention in the lifting phase to balance the load to avoid uncontrolled movements which could
cause work injuries to persons.
Do not place other weights on the packagings.
Do not drag or push the equipment as this will damage it.
Before lifting and handling the load, read the relevant information indicated in the "Information regarding
safety" Chapter.
VM
4.0 INFORMATION REGARDING HANDLING
AND TRANSPORT
17
TOR.VM.--.M.A.0518.EN
Issue: A
05.18