Safety And Danger Notes - Zumtobel ONLITE central CPS K Installation Instructions Manual

Table of Contents

Advertisement

Who may perform the installation?
The installation may only be performed by suitably qualified professional electrical specialists
who have been briefed on local and operational conditions.

1.2 Safety and danger notes

The central battery system ONLITE central CPS is part of the emergency and general lighting
system and consequently part of a building's safety equipment. Installation and
commissioning of the system must be performed with the appropriate care and precision.
d
Danger
Please note that the luminaires are supplied with 216 V DC in case of emergency
operation. Mortal danger by electrical shock!
d
Danger
Only qualified electrical specialists may perform work on the 230 V mains. Wiring of
current-carrying lines as well as signal and control lines must be done in accordance
with the relevant guidelines and standards. National guidelines and regulations
applicable in the country in which the system is being installed and operated have to
be observed.
d
Danger
Improper use of the batteries or battery-powered parts of the system can cause risk of
injury or mortal danger from high current or arcs that can occur briefly on battery
discharge.
Ensure that the batteries are connected to the correct poles!
d
Danger
Non-authorised or non-professional system installation and handling may result in
outages of the safety equipment. This implies immediate danger for people and the
security equipment itself. In addition, damages to machines and plants as well as loss
of productions are possible consequences at production sites.
d
Caution
Non-authorised or non-professional system installation and handling may result in
damages of the batteries. The contained electrolyte sulphuric acid is extremely caustic
and can lead to heavy injuries!
4

Advertisement

Table of Contents
loading

Table of Contents