6 Completing the installation

After having finished the luminaires check of the individual circuits and successfuly compared
the installation with the plans, the installation work can be completed.
Perform the following steps to complete the installation:
1. Open all outgoing fuses (F1 up to F20 max.) in the sub distributions (also connected
external sub distributions).
a The luminaires connected to these circuits are switched off.
2. Remove the fuses 2F103+ and 2F103- up to 2F109+ max. and 2F109- of the connected
external sub distributions.
3. Remove the battery fuses 2F4, 2F5, 2F6 and 2F7.
4. Reinstall the fuse elements 2F1, 2F2, 2F10.1 and 2F10.2.
5. Switch the system dead by opening the external main switch and protect the system
against re-engagement.
a The system is now out of operation.