Connecting The Line Monitors; Connecting The Line Monitors In A Circuit Monitored Sub Distribution; Connecting The Line Monitors In A Single Monitored Sub Distribution - Zumtobel ONLITE central CPS K Installation Instructions Manual

Table of Contents

Advertisement

3.3 Connecting the line monitors

3.3.1

Connecting the line monitors in a circuit monitored sub distribution

Connect the line monitors to the input terminals S1 to Sx of the circuit monitored sub
distribution (depending on the configuration of the ONLITE central CPS system).
The terminal block is labelled -4X1 (see following figure).
3.3.2

Connecting the line monitors in a single monitored sub distribution

Connect the line monitors to the input terminals S1 to Sx of the single monitored sub
distribution (depending on the configuration of the ONLITE central CPS system).
The terminal block is labelled -5X1 (see following figure).
13

Advertisement

Table of Contents
loading

Related Products for Zumtobel ONLITE central CPS K

Table of Contents