Applied Thermal Control Ltd
39 Hayhill Industrial Estate
Barrow-upon-Soar, Loughborough
LE12 8LD, United Kingdom
+44 (0) 1530 839 998
Service@thermalexchange.co.uk
Support@app-therm.com
3.0 QUICK START GUIDE
1 Remove all the packaging (Section 1.2)
2 Connect chiller's outlet and inlet process to your application
3 Fill up the chiller with appropriate coolant
4 Use the name plate on the back of the chiller to verify the appropriate
voltage and supply the power using provided cables.
5 Turn the power switch ON
6 Slowly add more coolant as process lines fill and the coolant is
circulated around the process system.
7 Using the controller, set the desired temperature.
Installation, Operation & Service Manual
G04/K04
QUICK START GUIDE
Rev 1 – 05/04/23
Need help?
Do you have a question about the G04 Series and is the answer not in the manual?