Euroflex MB-flex S aluminium Quick Installation Manual page 19

Conveyor system
Table of Contents

Advertisement

6. pH value test:
Inspect the conveyor again. Ensure that all residues of the chemical cleaning agent have been
removed from the conveyor belt.
To do this, check with a pH strip (litmus paper) whether all residues of the alkaline solution
have been removed.
Run the conveyor belt slowly to dry the conveyor belt. Meanwhile, remove accumulated water
from the floor.
7. Check and release for disinfection:
Check conveyor belt again by sensory analysis and disinfect.
ǃ
Use an adenosine triphosphate (ATP) test to confirm/exclude the presence of bacteria.
ǃ
If the ATP test is positive, clean the checked area again.
8. Disinfection:
Run the conveyor belt again at a slow speed. Use disinfectant as specified by the
manufacturer.
ǃ
Take care not to apply too much disinfectant so that the conveyor does not need to be
rinsed.
ǃ
Remove excess disinfectant via the drain.
Ready.
Contact euroflex GmbH for instructions on cleaning any further contaminants.
Quick installation guide_Conveyor system MB-flex S Al_20221114_EN.docx
Cleaning
19

Advertisement

Table of Contents
loading

Table of Contents