Crane Scale Loading - KERN HCD 60K-2 User Manual

Electronic crane scale
Table of Contents

Advertisement

5.2

Crane scale loading

To achieve correct weighing results, follow the following instructions, see the figures
on the following page:
 Always use the components for load hoisting which ensure one-point free scale
suspension.
 Do not use too large hoisting equipment which does not ensure one-point
suspension.
 Do not use multiple slings.
 Do not pull and move the load with the loaded scale.
 Do not pull the hook horizontally.
Scale loading
1. Place the crane scale hook above the load.
2. Lower the crane scale to enable load suspension on the scale hook. Once you
reach the suitable height, reduce the speed.
3. Hang the load on the hook. Ensure that the safety catch is closed. When installing
the load using rope slings, ensure that the slings are well positioned in the scale
hook saddle.
4. Raise the load slowly.
When installing the load using rope slings, ensure the load is balanced and the rope
slings are positioned correctly.
HCD-BA-e-2214
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcd 100k-2Hcd 300k-1

Table of Contents