8.2
Periodic maintenance and service
Periodic inspections and maintenance should be carried out as scheduled in
chapter 8.6 "Inspection cycles".
Periodic maintenance every 3 months can be carried out solely by trained
specialists possessing basic knowledge of the crane scale operation. It is
necessary to follow the national OH&S regulations as well as operating, user and
safety instructions in force in the user's location.
Always use validated control measures/feeler gauges for checking.
Periodic maintenance every 12 months can be carried out solely by trained
specialists.
The results of periodic and extended maintenance should be entered in relevant
checklists.
The replaced parts should be entered in the "Spare parts and repairs" checklist.
HCD-BA-e-2214
30