STACKED AND POLE-MOUNTED DEPLOYMENTS OF THE TOWER SYSTEM
Figure 170. Mounting the rigging plate on
CSUB610in the parallel configuration
• Position the Tower Rigging System Rigging plate atop the
CSUB610, as shown in the figure, with the six countersunk
mounting holes aligned with the six M6 threaded inserts.
• Insert the six M6×50 mm screws into the six holes in the rigging
plate. Thread these without tightening them into the underlying
threaded inserts in the CSUB610.
Figure 171. Top view of CSUB610 with Tower
Rigging System Plate installed in the parallel
configuration.
• Using a 4 mm hex key (Allen type) with a length that allows
for sufficient leverage, tighten the screws into the inserts in
opposing pairs to firmly attach the rigging plate to the CSUB610.
The plate should be perfectly flush with the cabinet at every
point and there should be no movement possible.

Installing Outriggers on the CSUB610

Installing the subwoofer outriggers improves the stability of the CSUB610
or SUB310 when deployed vertically on the floor. The outriggers are
recommended in any application in which the subs are deployed in
public areas where people could bump into them or lean on them.
These are also REQUIRED in any application in which other loudspeaker
enclosures are coupled to the subwoofer in an upright position. The
CSUB610 unit can be deployed with LCC44, LCC84 or combinations of
these in either a parallel or perpendicular configuration. Each of these
configurations requires that the outriggers be installed in the appropriate
configuration.
TIPPING HAZARD
Speaker enclosures stacked atop one another, even
when properly coupled, represent a tipping hazard.
TO
REDUCE
DAMAGE THAT COULD RESULT FROM POSSIBLE
TOPPLING OF LOUDSPEAKER ENCLOSURES,
THE
INSTALLATION
OUTRIGGERS ON THE SUB310 AND CSUB610
IS REQUIRED WHENEVER ONE OR MORE
LOUDSPEAKER
ATOP ONE OF THESE UNITS, EITHER IN A
STACKED CONFIGURATION USING THE TOWER
RIGGING SYSTEM OR IN A SUB/SATELLITE
CONFIGURATION USING A SPEAKER POLE.
Installing Outriggers for parallel (cardioid) deployment of
CSUB610 with LCC44/84
If the application requires the use of the cardioid functionality of
CSUB610 on axis with the LCC84 or LCC44 unit(s), the Outriggers must
be installed on the subwoofer in the parallel configuration, with the two
50°-angled outriggers extending forward to provide extended stability
at the front of the cabinet, while the two 90° outriggers are installed at
the rear. Naturally, this configuration can be used with omnidirectional
presets on the subwoofer, as well, but only when the LCC44 or LCC84
units are coupled parallel to the CSUB610, with all the forward grilles
facing the same direction.
Figure 172. Raising the leveling feet of the
Outriggers.
• Before installation, on each of the four Outriggers, raise the
leveling feet by screwing them in completely.
WARNING
THE
RISK
OF
INJURY
OF
THE
SUBWOOFER
ENCLOSURES
IS
MOUNTED
OR

Advertisement

Table of Contents
loading

Related Products for 1 Sound LCC44

This manual is also suitable for:

Lcc84Sub310Sub610Csub210Sub12

Table of Contents