Cisco NCS 4206 Installing page 32

Table of Contents

Advertisement

Power Cable Bracket (A9XX-PWR-CBL-MGMT)
Step 1
Attach the power cable bracket (A9XX-PWR-CBL-MGMT) to the rack with its preassembled captive screws. The
recommended maximum torque is 10 in.-lb (1.12 N-m).
Figure 25: Cable Management Bracket (A9XX-PWR-CBL-MGMT)
Step 2
Route the cables as show in the figure.
Installing the Cisco NCS 4206
32
Installing the Cisco NCS 4206

Advertisement

Table of Contents
loading

Table of Contents