Leveling & Sealing The Cabinet To The Floor - True TCGG-60-S-LD Installation Manual

Hide thumbs Also See for TCGG-60-S-LD:
Table of Contents

Advertisement

Installation (cont.)
Leveling
Proper leveling of your TRUE cooler is critical to operating success
(for non-mobile models). Leveling impacts effective condensate
removal and door operation.
Level the unit front-to-back and side-to-side.
1. Position the level on the inside floor of the unit near the doors
(the level should be parallel to cabinet front). Level the cabinet.
2. Position the level at the inside rear of cabinet (again, the level
should be placed parallel to cabinet back). Level the cabinet.
3. Perform procedures similar to steps 1 and 2 by placing the
level on inside floor (left and right side, parallel to the depth of
the cooler). Level the cabinet.
NOTE: If the cabinet has a center leveling screw, castor, or leg,
make sure it is adjusted properly so it makes full contact with
the floor after the cabinet has been leveled.
TEC_TM_122 | REV. A | EN
TCGG
Sealing the Cabinet to the Floor
Sealing the deli case to the floor may be required for local sanitary
codes or for the customer's application.
NOTE: Asphalt floors are susceptible to chemical attach. A layer
of tape may be place on the floor prior to applying sealant to
protect the floor.
True recommends using either of the following sealing methods:
• Vinyl cove base trim as produced by Armstrong, Johnson, or
Kentile (available at floor covering suppliers)
• Mastics available at hardware stores.
Cove Base Trim
1. Thoroughly clean the cabinet and floor of dirt and grease.
2. Apply a recommended contact cement to the cove base trim
and install the trim.
3. Let the cove base trim dry.
4. Fill in cracks and joints with caulking material.
Mastic
1. Thoroughly clean the cabinet and floor of dirt and grease.
2. Draw an outline of the cabinet base on the floor.
3. Raise and block the front side of the cabinet.
4. Apply a bead of mastic to the floor, 1/2" (13 mm) inside the
front part of the outline drawn in step 3.
5. Raise and block the rear of the cabinet.
6. Apply sealant to the floor on the other three sides as outlined
in step 4.
7. Lower the cabinet.
8. Examine the cabinet to ensure that it is sealed to the floor
around the entire perimeter.
NSF-Approved Sealants
• 3M #ECU800 Caulk
• 3M #ECU2185 Caulk
• 3M #ECU1055 Bead
• 3M #ECU1202 Bead
• Armstrong Cork – Rubber Caulk
• Products Research Co. #5000 Rubber Caulk
• G.E. Silicone Sealer
• Dow Corning Silicone Sealer
03/24/2021
truemfg.com
Page 7 of 18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tcgg-48-sTcgg-36-s-ldTcgg-72-ldTcgg-48-hc-ld

Table of Contents