Operation and Installation Manual PBTC-300
NOTICE
Manufacturer recommendation:
Measure insulation resistance before proceeding further
Make sure that it is free of any faults, eliminate faults if necessary
Procedure for insulation resistance measurement in Chapter 10 Commissioning.
Applying the Pipe Insulation
Apply the pipe insulation according to the manufacturer's installation instructions.
Apply an electrical warning label every 3 m on a clearly visible place.
21-54C3-7D0002/-
Notice: Technical data subject to change without notice.
01/2022-EHT-441169
No claims for damage arising from alternations, errors or misprints shall be allowed.
41
Seite 37 / 49