5.16 Initial start-up
5.16
Initial start-up
26
■■■■■■■■
Length: max. 2 m
■
Number of cores: 3, with protective conductor
■
Instrument plug: IEC 60320 type C13
■
Conductor cross-section 3x min. 1.0 mm
■
Power plug:
■
– according to customer requirement (6.2122.XX0)
– min. 10 A
NOTICE
Do not use a not permitted power cord!
1 Plugging in the power cord
Plug the power cord into the instrument's power socket.
■
Connect the power cord to the power grid.
■
Even before the guard column and separation column are installed, the
entire system must be completely rinsed with eluent for the first time.
Rinsing the IC system
CAUTION
The separation column and the guard column are not permitted to be
installed at the time of the initial start-up.
Make sure that a coupling (6.2744.040) is being used instead of the
columns.
1 Preparing the software
Start the MagIC Net computer program.
■
Open the Equilibration tab in MagIC Net: Work-
■
place ▶ Run ▶ Equilibration.
Import (or create) a suitable method.
■
Also see: MagIC Net Tutorial and online help.
2 Preparing the instrument
Ensure that the eluent aspiration tubing is immersed in the eluent
■
and that there is enough eluent in the eluent bottle.
■■■■■■■■■■■■■■■■■■■■■■
2
/ 18 AWG
930 Compact IC Flex Oven/Deg/MB (2.930.2180)
Need help?
Do you have a question about the 930 Compact IC Flex and is the answer not in the manual?