Glow Engine Installation - Hangar 9 Katana 50 ARF Assembly Manual

Table of Contents

Advertisement

Glow Engine Installation

Required Parts
Fuselage assembly
Plywood motor template
M3 flat washer (8)
M4 flat washer (4)
M4 blind nut (4)
M3 lock nut (4)
Nylon engine mount (2)
150mm pushrod housing
Engine with hardware
Plywood tank disk
1.5mm x 300mm Z-bend pushrod
M4 x 20 socket head screw (4)
M3 x 25 socket head screw (4)
Pushrod connector with setscrew
1. Locate the items for this section of the manual.
Hangar 9 Katana 50 ARF
2. Position the appropriate plywood engine template so
it fits in the opening. It may be necessary to lightly sand the
edges of the template. Use a drill and 1/16-inch (1.5mm)
drill bit to drill the four guide holes in through the template
and into the firewall.
3. Remove the template. Use a drill and 11/64-inch
(4.5mm) drill bit to enlarge the holes in the firewall.
4. Use a drill and 9/64-inch (3.5mm) drill bit to drill the
hole for the throttle pushrod.
5. Locate the plywood tank disk. Use medium CA to glue
the disk into the opening in the firewall as shown.
25

Advertisement

Table of Contents
loading

Table of Contents