Commissioning And Trial Run; Commissioning Flowchart; Precautions On Safety; Preparations - Sinclair SWH-200DE Service And Installation Manual

Table of Contents

Advertisement

SINCLAIR

1 Commissioning Flowchart

Outdoor unit

2 Precautions on Safety

Before commissioning, ensure that the power supply model, possible usage range (pipe distance,
indoor and outdoor high and low voltage difference, and power supply voltage), and installation space
meet user requirements.
After verifying that no exception exists upon commissioning, introduce the operation and
maintenance method to the customer according to the user manual. In addition, deliver the precautions
and user manual to the customer for careful storage.

3 Preparations

3.1 Tool Preparation for Commissioning

High-pressure and low-pressure gauges for the related refrigerant system
AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL

COMMISSIONING and TRIAL RUN

Check before
commissioning
Start the unit for
commissioning.
Set unit parameters.
commissioning.
Adjustable wrench
Phillips screwdriver
Straight screwdriver
Vacuum pump
Electronic scale
Water tank
Accept after
Hex key
44
Electric connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

Swh-35era2

Table of Contents